Library (Archive)

DARC is working days after receipt of Document from SwRI

Document Version CDRL Due Date Date Delivered Date Updated Downloads
Detailed Work Plan - Draft 1.0.0-Draft 1-1.1 Oct 21, 2003 Oct 16, 2003  
FDOT Comments: Detailed Work Plan n/a n/a 10 DARC Nov 5, 2003 Dec 3, 2003
Kick-Off Meeting Materials n/a n/a Nov 6, 2003 Nov 6, 2003  
PERT Schedule 1.0.3 1.3 Nov 4, 2003 Oct 30, 2003 Feb 9, 2004
Gantt and CPM Summary Schedule 1.0.3 1-4 Nov 4, 2003 Oct 30, 2003 Feb 9, 2004   
See the status reports section for the most recent schedule
FDOT Comments: Risk Mitigation Plan n/a n/a 10 DARC Nov 17, 2003 Nov 24, 2003
Software CM Plan - Draft 1.0.0-Draft 2-9.1 Nov 4, 2003 Nov 3, 2003
FDOT Comments: Software CM Plan n/a n/a 10 DARC Nov 20, 2003 Nov 24, 2003
Detailed Work Plan - Final 1.0.0 1-1.2 Nov 19, 2003 Dec 9, 2003
Software Development Plan - Draft 1.0.0-Draft 2-4.1 Nov 25, 2003 Nov 26, 2003  
FDOT Comments: Software Develop. Plan n/a n/a 10 DARC May 5, 2004 May 18, 2004

Interface Control Documents (Design):

2-7.3 Nov 22, 2003 Nov 21, 2003 July 30, 2004 Use links to the left (document name)
   Center-to-Center Status ICD 3.1.1
   Center-to-Center Command/Control ICD 3.1.1
   CCTV Video Switch ICD 1.0.0-Design
   CCTV Device Driver ICD 1.0.0-Design
   CCTV Client Interface Manager ICD 1.0.0-Design
   Data Bus Client Interface Manager ICD 1.0.3-Design
   Data Bus Subsystem ICD 1.0.3-Design
   Dynamic Message Sign Subsystem ICD 1.0.0-Design
   Highway Advisory Radio Subsystem ICD 1.0.0-Design
   Incident Management Subsystem ICD 1.0.0-Design
   Transportation Sensor Subsystem ICD 1.0.0-Design
   Transp. Sensor Subsystem Device Driver ICD 1.0.0-Design
Concept of Operations - Draft 1.0.2-Draft 2-10.1 Nov 25, 2003 Mar 4,2004 Oct 28, 2004

FDOT Comments: Concept of Operations

n/a

n/a

10 DARC

Mar 31, 2004

Jan 3, 2005

 

Software Requirements Spec - Draft 1.0.1-Draft 2-1.1 Jan 1, 2004 Dec 22,2003 Jan 29, 2004
2.0.0-Draft 2-1.2 n/a Aug 27, 2004  
FDOT Comments: Sfwr Requirements Spec n/a n/a 10 DARC Feb 27, 2004  
Output from Requisite Pro - Draft 1.0.1-Draft 2-2.n Jan 1, 2004 Dec 19,2003 Jan 29, 2004

FDOT Comments: Output from Requisite Pro n/a n/a 10 DARC No comments - per FDOT on 6/30/05
Logical Database Design Preliminary 1.0.0-Preliminary 2-3.1 Nov 27, 2003

Delayed because of FDOT License

Feb 20,2004  
Logical Database Design Final 2.0.0

2-3.2

2-3.3

Oct 30, 2005 Oct 27, 2005  
Database Design Document Final
Risk Mitigation Plan Final 1.0.0 1-7.2

Rev: 1-7.2.n

Dec 2, 2003 Nov 25, 2003  
Software Quality Assurance Plan - Draft 1.0.0-Draft 2-5.1 Dec 2, 2003 Nov 25, 2003  
FDOT Comments: Software Quality Assurance Plan n/a n/a 10 DARC May 5, 2004 May 18, 2004
Software Security Plan - Draft 1.0.0-Draft 2-6.1 Dec 9, 2003 Mar 4,2004  
FDOT Comments: Software Security Plan n/a n/a 10 DARC May 30, 2004  
Software Requirements Spec - Final 1.0.2 2-1.2 Apr,13 2004 Apr 2,2004  
2.0.3 2-1.2 n/a Oct 28, 2004 Oct 13, 2005
Output from Requisite Pro 1.0.2 2-2.1 n/a Apr 2,2004  

2.0.3 2-2.2 n/a Oct 17, 2005  

FDOT Comments: Interface Control Specification n/a n/a 10 DARC Oct 27, 2004  
Computer Sizing Estimates 1.0.0 n/a n/a Feb 4, 2004  
Ramp Metering Software Analysis 1.0.1 n/a n/a Dec 19, 2003 Feb 7, 2004
Software Integration Plan - Draft 1.0.0-Draft 3-1.1 Mar 5, 2004 Aug 27, 2004  
FDOT Comments: Software Integration Plan n/a n/a Sep 27, 2004    
Software Acceptance Test Plan - Draft 1.0.0-Draft 3-2.1 Jun 5, 2004 Sep 7, 2004  
FDOT Comments: Software Acceptance Test Plan n/a n/a Oct 19, 2004 Oct 12, 2004  
Software Integration Plan - Final 1.1.0 3-1.2 Oct 11, 2004 Oct 7, 2004 Apr 26, 2004
Software Acceptance Test Plan - Final 1.1.0 3-2.2 Oct 19, 2004 Oct 20, 2004 Apr 26, 2004
Software Design Document - Draft 1.0.0-Draft 2-7.1 May 18, 2004 Apr 14, 2004  

(5 MBs)

FDOT Comments: Software Design Document n/a n/a 10 DARC Aug 9, 2004  
Software Integration Case Proc - Draft 1.1.0-Draft 3-1.6 Jul 18, 2004 Oct 7, 2004 Nov 22, 2004
FDOT Comments: Software Integration Case Proc n/a n/a n/a Nov 1, 2004  
Training Plan - Release 1 - Draft 1.1.0-Draft 5-1.1 Sep 1, 2004 Aug 27, 2004  
FDOT Comments: Training Plan - Release 1 n/a n/a Sep 27, 2004    
Software Design Document - Final 2.0.0 2-7.2 Dec 13, 2004 Dec 13, 2004 Nov 11, 2005 HTML Files too large to "Zip" - see FDOT PM for a copy
Software Integration Case Proc - Final 1.1.4 3-1.7 Dec 30, 2004 Dec 28, 2004 May 27,2005
Software Test Procedures - Draft 1.1.0-Draft 3-3.1.1 TBD May 31,2005  
FDOT Comments: Software Test Procedures n/a n/a        
Training Plan - Release 1 - Final 1.0.0 5-1.2 Oct 11, 2004 Oct 22, 2004  
Training Material - Release 1 1.1.0 5-1.3 TBD Jun 23, 2005   Operator:
1.1.0 Jun 23, 2005 Administrator:
1.1.3 Aug 10, 2005 Developer:
Software Test Procedures - Final   3-3.2.1 TBD Jun 7, 2005  
Functional Configuration Audit 1.0.0 6-2 Jan 10, 2005 Jan 10, 2005  
Final Acceptance Test Readiness Review n/a 6-3 Jan 9, 2005 Jan 13, 2005 May 26,2005
Nov 1, 2005 Oct 28, 2005  
Hot Wash-Up Minutes - Release 1 n/a 6-4 Jan 20, 2005 Jan 14, 2005  
Hot Wash-Up Minutes - Release 1.1 n/a 6-4 Jun 10, 2005 Jun 7, 2005  
Training Progress Report   5-1.4 TBD Jun 30, 2005  
Software Test Report - Release 1   3-4.1 Jan 21, 2005 Jan 21, 2005  
Software Test Report - Release 1.1   3-4.1 Jun 10, 2005 Jun 7, 2005  
Version Description Document 2.0.0

6-6

6-8

Oct 2, 2004 Oct 22, 2004 Oct 27,2005
Software User’s Manual - R1 1.0.0-Draft 6-7.1 Oct 2, 2004 Nov 30, 2003  
Software User’s Manual - R1.1 Update 1.1.1 6-7.2 Jan 14, 2005 Jan 13, 2005 Jun 6,2005
Final Acceptance Test Report   6-5 TBD      
Release 1 CM Repository (ClearCase and VSS format) 1.0.0 6-9.1 Jan 11, 2005 Jan 10, 2005 May 24,2005

Delivered on DvD

Release 1 Installation CD 1.1.1 6-9.2 Jan 11, 2005 Jan 10, 2005 Jun 9,2005

Delivered on CD

Release 2 Specific Deliverables

Training Plan - Release 2 - Draft 2.0.0-Draft 5-2.1 TBD Oct 17, 2005  
Training Plan - Release 2 - Final 2.0.0 5-2.2 TBD Nov 11, 2005  
Training Material - Release 2.1.2   5-2.3 TBD Nov 11, 2005 Oct 20, 2006 Operator:
Administrator:
Training Progress Report   5-2.4 Nov 29,2005 Nov 28, 2005  
Software Integration Plan - Release 2 -Draft 2.0.1-Draft 3-1.3 TBD Sep 9, 2005  
Software Integration Plan - Release 2 -Final 2.0.1 3-1.4 TBD Oct 6, 2005 Oct 13, 2005
Software Integration Case Proc - R2 Update 2.0.3 3-1.8 TBD Oct 21, 2005 Nov 1, 2005
Software Test Report - Release 2   3-4.2 TBD Nov 8, 2005  
Sfwr Accept.Test Corrective Action Plan   3-2.4 TBD      
Software User’s Manual - R2 Update   6-7.2 Nov 1, 2005 Oct 28, 2005  
Release 2 CM Repository   6-10.1 Nov 1, 2005 Oct 28, 2005  

Delivered on CD

Release 2 Installation CD   6-10.2 Nov 1, 2005 Oct 28, 2005  

Delivered on CD

Lee County Implementation Plan   7-10 TBD n/a